Created
Jun 24, 19:31
DevOps handoff
Type
Chore
Shape
backend
Worktree Slug
plan-rolio-rails-eol-upgrade-2
Repositories
rolio
Release Train
—
Branch
feat/plan-rolio-rails-eol-upgrade-2
Pull Request
—
Local URL
—
QA URL
—
Production URL
—
Acceptance Criteria
Expected Test Plan
No expected checks recorded.
Checks Run
No completed checks recorded.
Agent Context
brakeman EOLRails flags Rails 7.2.3.1 support ending 2026-08-09 (currently ignored in config/brakeman.ignore so it doesn't gate CI). rolio tracks McRitchie Studio's Rails 7.2.3 pin, so this is an ecosystem-wide upgrade decision. When the upgrade lands, drop the brakeman.ignore entry. Surfaced during unblock-rolio-CI 2026-06-24.
Stage Timeline
Who handled each stage, the time it took (measured), and the model / tokens / cost reported (best-effort) — plus who's on it right now. — means the agent didn't report that metric.
Conversation
QA review feedback, agent handoffs, and follow-up notes for this task.
No task feedback has been recorded yet.
Sealed-bid sizing
Edit →Alex (PM)
—
Avi (PO)
—
Dev
—
Actual
—
We emailed a one-tap sign-in link to . It expires shortly and can only be used once.
No email? Check spam, or close this and try again.