Created
Jun 25, 04:03
Started
Jun 25, 05:07
Completed
Jun 25, 21:00
DevOps handoff
Type
Chore
Shape
backend
Worktree Slug
rolio-rails-8-1-upgrade
Repositories
rolio
Release Train
—
Branch
feat/rolio-rails-8-1-upgrade
Pull Request
https://github.com/amcritchie/rolio/pull/12Local URL
—
QA URL
—
Production URL
—
Acceptance Criteria
Expected Test Plan
Checks Run
Agent Context
Standalone contacts app, no studio-engine dependency, Ruby already 3.3.11 — the only app that can move without waiting on the engine. Target 8.1.3 (latest stable). Part of the coordinated ecosystem 8.1 train decided 2026-06-24. The EOLRails brakeman.ignore entry currently rides branch feat/repin-error_highlight-for-ruby-3-3 (commit eb489d4), NOT yet on main; remove that one ignored_warnings entry when 8.1 lands (if the Rails bump merges first there is nothing to remove yet). 7.2 security EOL 2026-08-09.
Stage Timeline
Who handled each stage, the time it took (measured), and the model / tokens / cost reported (best-effort) — plus who's on it right now. — means the agent didn't report that metric.
Conversation
QA review feedback, agent handoffs, and follow-up notes for this task.
PR #12 (Rails 7.2.3.1 → 8.1.3) QA-passed (Avi, reviewed) and MERGED to main (merge 6c85d64) per operator 'merge to main' decision — rolio has no release branch / conductor pipeline. brakeman EOL ignore removed; suite 118/0; CI green. OPEN: rolio prod deploy (if any) is the operator's separate lane — bump to shipped once deployed/confirmed. Worktree .worktrees/rolio-rails-8-1-upgrade is now a reclaim candidate.
Reconciled assembled->shipped. 'Deployed' = PR #12 (Rails 8.1) merged to rolio main; rolio is standalone (not in the conductor pipeline / no hosted target), so merged-to-main is its terminal state. This upgrade is the 8.1 floor the hotwire shell rebased onto.
Sealed-bid sizing
Edit →Alex (PM)
—
Avi (PO)
—
Dev
—
Actual
—
We emailed a one-tap sign-in link to . It expires shortly and can only be used once.
No email? Check spam, or close this and try again.