Extend the DevOps cycle snapshot with read-only batch planning so a conductor can split many PR review and QA review tasks into safe parallel lanes.
Created
Jun 18, 20:47
Started
Jun 18, 20:47
Completed
Jun 18, 22:46
DevOps handoff
Type
Feature
Shape
—
Worktree Slug
—
Repositories
mcritchie-studio
Release Train
2026-06-18-devops-batch-planner-v1
Branch
feat/devops-batch-planner-v1
Local URL
http://localhost:3021Production URL
https://mcritchie.studio/devopsAcceptance Criteria
Expected Test Plan
Checks Run
Stage Timeline
Who handled each stage, the time it took (measured), and the model / tokens / cost reported (best-effort) — plus who's on it right now. — means the agent didn't report that metric.
No stage changes recorded yet.
Conversation
QA review feedback, agent handoffs, and follow-up notes for this task.
PR #46 is open for DevOps batch planner v1: https://github.com/amcritchie/mcritchie-studio/pull/46. Verification: ruby -c bin/devops-cycle; offline --plan smoke; offline --json --plan smoke; focused command tests 4 runs / 51 assertions; bin/rubocop; live read-only bin/devops-cycle --no-refresh --plan. CI is running.
PR #46 merged as cd0b46e and deployed to McRitchie Studio QA. QA URL: https://qa.mcritchie.studio/devops. Verification after deploy: bin/qa-server status mcritchie-studio returned heroku /up 200 and qa /up 200; curl https://qa.mcritchie.studio/up returned 200; PATH=/opt/homebrew/opt/ruby@3.3/bin:/opt/homebrew/bin:/opt/homebrew/lib/ruby/gems/3.3.0/bin:$PATH bin/devops-cycle --no-refresh --plan runs from current main. Production not deployed.
Avi QA handoff: PR #46 merged as cd0b46e and current origin/main was deployed to McRitchie Studio QA. QA URL: https://qa.mcritchie.studio/devops. Verification: ruby -c bin/devops-cycle; offline --plan; offline --json --plan; focused Rails tests 9 runs 80 assertions 0 failures; bin/rubocop 382 files no offenses; GitHub CI green; bin/qa-server deploy returned QA /up 200. Production not deployed.
Avi QA acceptance: DevOps batch planner is accepted from QA. Current main cd0b46e is deployed to https://qa.mcritchie.studio/devops; CLI --plan groups PR Review / blocked / QA Review / Prod Ready as intended; focused tests and RuboCop passed; GitHub CI green. Moved to prod_ready for explicit production approval. Production not deployed.
Avi production closeout: deployed approved McRitchie Studio release train to production as Heroku release v71 at ef693ab. PR #49 was intentionally excluded by deploying ef693ab rather than current main. Migration passed; web and worker dynos are up; /up and /signin return 200; read-only Playwright smoke passed 2 tests against https://mcritchie.studio. Moving task to done.
Avi post-deploy note: Discord release note for production release v71 at ef693ab was sent to the release-notes webhook after the deploy.
Sealed-bid sizing
Edit →Alex (PM)
—
Avi (PO)
—
Dev
—
Actual
—
We emailed a one-tap sign-in link to . It expires shortly and can only be used once.
No email? Check spam, or close this and try again.